Kitchen Renovation Timeline & How Long Should the Average Kitchen Remodeling Take.

Average kitchen remodeling projects take between 5-8 weeks; however, the total time to remodel a kitchen with larger spaces, including wall demolition and changes of the floor plan will fall between  10 – 18 weeks.

Kitchen Remodeling Planing

A kitchen is often the heart of a home, and remodeling it means temporarily pausing its bustling activity for a much-needed upgrade. The temporary inconvenience is a small price to pay for the stunning transformation awaiting your kitchen.

Nevertheless, it’s important to acknowledge that kitchen remodeling can be a messy and overwhelming process, potentially disrupting your home’s routine.

Naturally, the duration of the remodel is a common concern. While it’s challenging to specify an exact timeframe, the complexity and scale of your project are the main factors influencing the duration.

If your plans involve:

  • Keeping the kitchen’s existing footprint,
  • Not altering plumbing or electrical points,
  • Using readily available materials and standard cabinets and countertops,

then the renovation could take approximately 4 to 6 weeks.

Conversely, expect a timeline of three to five months for more extensive remodels that involve:

  • Completely changing the kitchen layout,
  • Relocating kitchen areas, which might need city permits and board approvals,
  • Using imported or custom-designed materials and fixtures.

For minor, cosmetic changes, your kitchen’s facelift could be completed in just a few weeks. Each project is unique, but understanding these general timelines can help you plan effectively for your kitchen’s transformation.

Go in for a complete kitchen makeover.

Complete kitchen makeovers would entail changing everything from floor to countertops and cabinets to installing new appliances and finishing. This automatically translates into managing and coordinating multiple parties as well as several moving parts. According to our experts, this could take anywhere from three to five months. But it will definitely reduce the timeframe if you order everything through one contractor.

The kitchen remodeling time-frame varies as per requirements greatly.

Here is a compilation of data that will help you estimate the time needed for your kitchen remodeling.

Task Time Estimate Comments
Planning Depends on you Time taken for planning depends on you. It can happen anywhere between days and years. It depends on the scope of changes and your preferences.
Finding a Contractor Depends on you Before you finalize on a contractor take into consideration their reviews and referrals other than meetings with them. Do not forget to consider the kitchen remodeling cost determination and the time frame they can finish the work in.
Initial Design Process 1-3 days This again depends on you primarily. Before finalizing anything think over what is it that you want to do.
Final Design Process 1-4 weeks This depends on how clear you are about what you want and the scope of changes you need to get done.
Ordering Product 1-2 months Choose and order the products, appliances, and materials needed for the new kitchen in time. You may need to return or customize them which would need even more time.

Demolition and Structural Changes

2-3 days to 2-3 months Do take into account the time needed to remove/demolition the existing kitchen. For bigger changes, like moving a wall or making a window in one, more time would be needed.
Plumbing and Electrical Changes 2-4 days to 2 weeks You can change the position of your sink, appliances, and stove and get plumbing and electrical changes done accordingly.
Painting 2-3 days Get the paint done before installing the finished cabinets. It is easier and saves the cabinets from staining.
Flooring 1-2 days The time taken in floor installation depends on:

The type of flooring

Whether you will install the floors yourself or hire a professional

The size of your kitchen and floor

Cabinets 2-4 days The time taken to fit in the cabinets also depends on whether you install them yourselves or hire a professional.
Countertop Measurements 1 day Make sure that you book the countertop measurement vendor well in time to avoid any delays.

Appliance Installation Part-1

1-2 days This involves the installation of all built-in appliances that can be fitted without any hindrance from countertop installation later on.
Install Lighting 1-2 days This would include ceiling lights, under-cabinet lights, and workspace lights.
Countertop Fabrication 1-4 weeks This stage does not involve any installation. You only wait for the countertops to get fabricated. Time taken for this would vary based on the material you choose.
Countertop Installation 1-2 days Once the countertops are delivered, they will be ready to fit in the kitchen.
Backsplash Install 1-2 days The duration for installing this would also vary following your choices of material and design.
Appliances Installation Part-2 1-2 days This would incorporate the installation of the sink and all the remaining appliances not affected by countertop installation.
Carpentry Finishing 2-4 days The timeline for this depends on your design and pending details. This usually includes floor trim, toe tick area, cabinet adjustments, hardware etc.
Total time taken 3-6 Months

It can be concluded that in some cases a kitchen remodeling project can take from 3-6 months to be executed.

Bonus Tips: Making Kitchen Remodeling Easy

To further assist you, we’ve detailed the progression of the kitchen remodeling process:

Remove and Demolish:

The first step involves removing or demolishing the existing kitchen components. Depending on the remodel’s scope, this might include taking out cabinets, flooring, appliances, and more. Typically, this process can take a couple of days.

Markings:

A crucial stage in kitchen remodeling, this involves marking out the locations for appliances, power feeds, and plumbing sources. Everything is carefully marked, and cut-sheets are prepared for the electrician, ensuring precise installations.

Mechanical Installations:

At this stage, we install essential systems such as HVAC, plumbing, and electrical fittings. This phase usually takes about a week to complete.

Drywall and Flooring:

Following demolition and electrical installations, we move on to installing drywall and flooring. Drywall is prepped and installed, paving the way for the flooring. The time required for flooring depends on the material – about four days for ceramic tiles and up to a week for wooden flooring.

Counter Tops and Cabinets:

Next, we install new cabinets and countertops. This stage signifies that the bulk of the messy work is nearly complete. Cabinets are carefully fitted, with any gaps corrected. If you opt for granite slabs, they require around ten days for fabrication before they can be delivered and installed.

Finishing Stage:

With most installations in place, we focus on the finishing touches. This includes completing hardwood floors, installing remaining plumbing fixtures, adding backsplashes, and painting.

Final Fittings:

At this final stage, the kitchen is almost ready. We install and set up new electrical appliances. Once this is done, your dream kitchen is ready for use.

We emphasize that the duration of kitchen remodeling varies based on each project’s unique requirements and scope. On average, the process takes about six to eight weeks.

We hope this detailed breakdown of the kitchen remodeling process helps you better estimate the time needed for your kitchen renovation project.

Essential Tips for a Smooth Kitchen Remodeling Experience

Planning:

Start with a comprehensive plan, noting down every detail from start to finish. Lists and meticulous planning are crucial. A well-conceived plan, especially with professional assistance, increases the likelihood of completing the remodel on time and within budget.

Place Orders in Time:

Ensure that all orders for fittings, materials, and appliances are placed well in advance. It’s also important that your remodeling team, builder, or contractor has all specifications and instructions beforehand.

Drawings for Clarity:

Many experts recommend obtaining drawings or, if possible, 3D renderings of the proposed kitchen design. This provides both you and the builders with a clear vision of the expected outcome.

Make Alternate Arrangements:

During the remodeling phase, you’ll likely experience a period where your kitchen is out of commission. Consequently, it’s wise to plan ahead for alternative meal solutions. This might include relying on microwavable food, opting for take-out, or even setting up a makeshift kitchen in another part of your house, equipped with essentials like a sink, refrigerator, and gas range. Don’t forget to arrange for drinking water, perhaps storing bottled water, and have paper plates and disposable utensils on hand.

Do Not Rush:

It’s essential to maintain regular communication with your designer and contractors throughout the remodeling process. However, it’s crucial to resist the urge to rush them. Applying pressure on the team to speed up can inadvertently lead to mistakes and subpar workmanship, subsequently requiring additional time to rectify these issues. In essence, rushing the process often leads to increased delays and diminished efficiency.

Avoid Changes Later:

Carefully plan every detail of your kitchen remodel timeframe to avoid the need for changes midway through the project. Such alterations can complicate and prolong the process. Also, remember to check the necessity of permits for remodeling, as requirements vary across different cities.

Stick to Your Budget:

Decide on the extent of your kitchen remodel timeline, establish a clear and realistic budget, and settle on a new design. While it’s crucial to draft a budget that accommodates contingencies, it’s equally important to stick to this budget as closely as possible.

Question Your Kitchen Remodeling Contractor:

Do not hesitate to clarify any doubts or questions you might have with your contractor. Fully understanding the process you are embarking upon is key to a successful kitchen remodel.

Involve Your Family:

Engage with your family members in discussions about the remodel. They might offer valuable suggestions and help in sharing the responsibilities that arise during the process.

Stay Positive:

Lastly, it’s important to stay positive and embrace the remodeling journey. Although disagreements with family or contractors might arise, and not everything may go as planned, maintaining optimism is essential. Remember, each challenge is a step towards achieving your dream kitchen. Take it one day at a time, and remind yourself that the transformation at the end will be worthwhile.

Kitchen Remodeling by BRV Remodeling Inc.

Once you make up your mind to finally revamp your kitchen do contact us, we at BRV Remodeling Inc. would be happy to offer our services.

We are licensed and insured general contractors based in Sumner, Washington.

With over twenty years of experience in the construction industry, we take pride in our proven expertise and legacy. Our team specializes in transforming old kitchens into dream spaces, meticulously tailored to our clients’ visions.

Other than kitchen and bathroom remodeling we also provide services for complicated home remodeling. Call at (253)317-9445 to set up an appointment with us today!